Our projects
We give each project the personalized attention it deserves. We work closely with our clients to fully understand their ideas and adapt to their concerns while respecting the agreed budget. Discover some of our latest projects below and if you want more information, contact us.
Mining Operation
Client: SMM (Managem) Senegal
Year: 2023-2027
Work duration: 4 years
The Boto project is located in eastern Senegal, near the borders of Mali and Guinea, and 88 km from the town of Kédougou. The mine is located within the right of way of the Senegalese-Malian shear corridor, 5 km wide and around 200 km long, which has several world-class deposits including Loulou and Fekola in production.
MCI Senegal is in charge of the works:
-
Construction of infrastructure for the TSF/Earthwork mine, minerals
-
Construction Fresh Water Pond (FWP)
-
Construction of Surface Water Management (SWP)
MCI is also in charge of the exploitation of two deposits as well as drilling and blasting work
Construction of regional airports - Guinea
Client: Civil Aviation Guinea/TMH/UMS
Year: 2023-24
Duration of works: 12 months
This involves the reconstruction and rehabilitation of four aerodromes located in the regions of Kankan, Faranah, Labé and N’Zérékoré.
They will each include a terminal, a control tower, a 2 km 500 runway 30 meters wide
Mining Operation
Client: SMM (Managem) Guinea
Year: 2023-2027
Duration of works: 4 years
As part of an increase in its capacity, MCI has been in charge of mining operations on the TRI-K Mine since 2023.
-
The movement of more than 17 millions T/year of ores
-
Sterile storage
-
Transportation of ores to the factory
-
Blasting and drilling
Mining Operation
Client: Mawared Mining UAE
Année : 2018/2028
Durée Travaux : 10 ans
Description: The project is located approximately 80 km. North-east of Dubai and about 28 km south-east of Ras Al Khaimah.
-
The project consists of drilling, blasting, crushing, ore 15 million M3 / year or 30 million Tons / year
-
Transportation of minerals from the extraction area to the factory.
-
The aggregates are then stored according to their diameters
Mining Operation
Client: Mawared Mining OMAN
Année : 2021
Durée Travaux : 5 ans
Description: The Al Ghuzayn project is the first copper mining project of its kind in Oman. The project is located in the Wilayat of Al Khaboura.
The operation involves the extraction of 10 million t/year of ore, i.e. a total of 50 million tonnes
Tailing Storage Facility (TSF)
Client: SMM (Managem) Guinea
Year: 2022-2023
Work duration: 7 months
Description : This is the construction of the second phase of the Tailing Storage Facility (TSF) on the TRI- K project located in the prefecture of Mandiana in Guinea.
-
Removal of over 2 million m3 of laterite
-
Supply and installation of geomembrane
-
Concrete-lined penstock settling system and energy dissipator
-
Associated infrastructure such as storm water diversion tranches, canalisation (HDPE pipe), silt traps, energy dissipator.
Infrastructure works for the oil refinery in Kamsar
Client: BRAHMAS (Refining Company of Guinea SRG) - Kamsar
Year: 2022-2024
Work duration:: 24 months
Description : The refinery is a modular refinery to process a wide variety of crude oil. Its capacity is 12,000 barrels of oil per day, with a storage capacity of 38,000 m3 of crude and 151,700 m3 of product.
-
Preparatory work with the creation of access roads and the life base
-
Construction of an oil port of over 200 ml to accommodate 25,000 T ships
-
Earthworks
-
Foundation work for the future refinery
Description : This involves the construction and rehabilitation of 200 km of mining road between the SBG mine (Société de Bauxite de Guinée) and the port of Konta in the commune of Forécariah (Guinea)
-
The creation of 140 km of mining road with a 20 Ml right-of-way capable of supporting a 20 T axle load
-
The construction of 2 bridges on the National 1 and on the KOLENTE river of 25 ml of crossing
-
Rehabilitation of a 60 km long old mining road
Development works Port BON AMI Kamsar-Guinea
Client: Dynamic Mining
Year: 2021
Duration of work: 4 months
Construction works Mining road SOUTH Corridor
Client: EMC
Year: 2019
Duration of work: 7 months
Description : This involves the construction and rehabilitation of 200 km of mining road between the SBG mine (Société de Bauxite de Guinée) and the port of Konta in the commune of Forécariah (Guinea)
-
The creation of 140 km of mining road with a 20 Ml right-of-way capable of supporting a 20 T axle load
-
The construction of 2 bridges on the National 1 and on the KOLENTE river of 25 ml of crossing
-
Rehabilitation of a 60 km long old mining road
Construction works of the SBG Mining terminal
Client: Bauxite Company of Guinea
Year: 2020
Duration of work: 6 months
Description :This involves the construction and rehabilitation of the evacuation port terminal (Konta)
-
The development of 7 ha of land
-
The construction of a jetty capable of receiving 10,000 ton ships and evacuating 6 million tons
-
The development of the platform with an estimated storage capacity of 700,000 tons. The loading capacity is 3000 ton/hour
Rehabilitation works N23 Boké
Client: TML/ State of Guinea
Year: 2020
Duration of work: 4 months
This is the rehabilitation of 53 km of the National Road 23 (N23) located between Wendou Borou and Boké. The works consisted in rehabilitating the entire roadway, replacing the wearing course, installing emergency stop strips, repairing the engineering structures, and installing a new road.
Port SNG construction works
Client: SNG (Guinean Naval Company)
Year: 20019
Duration of work: 6 months
Description : Extension of the existing harbour by 150ml, with a rockfill dyke and a 60ml wide boulder quay allowing transport boats to go back and forth between the islands and the mainland without tidal problems
Mining road BON AMI project
Client: Dynamic Mining
Year: 2021
Duration of work: 7 months
Description : Construction of a mining road (length 30 km) including the construction of five (5) bridges (length between 20ml and 100 ml)
Installation of the conveyor
Client: Gac/Afcons
Year: 2018
Duration of work: 7 months
Description : Supply and installation of maritime and material resources (conveyor…)